Reconstruction of Gwangjin Bridge
 
Road construction and bridge erection have dynamic interrelationship
with each other.
Samwhan, with its abundant performance record in the field of road
construction, has also been accumulating diversified experience
in bridge erection, covering more than 100 large and small bridge
incidental to its overall highway construction performance
surpassing 1,500km and thereby accumulating new construction
methods and expertises.
Gwangjin Bridge is a Steel Box Girder type bridge.
Total length is 1,056m and the width is 20m with 4 lanes.
It is due to be completed in December 2003.