| Seoul
beltway Construction Project |
|
|
Samwhan
is participating, as a consortium member, in the Seoul Beltway
construction
project, which is being performed on a BOT basis.
Total length of the Seoul Beltway is 36.3 km starting from
Naegok-dong, Goyangsi to
Byeollae-myoun, Namyangju-si, Gyeonggi-do Province with
the width of 37.8m (8 lanes).
Construction period of the project is from june 2001 to
February 2007.
After completion of the work, the Beltway will be operated
by the consortium for
30 years until February 2037. Total project budget is about
2 trillion Korean won.
As one of the most reliable constractors at home, Samwhan
has been participating
in the construction of Contour Beltway Project in the metropolitan
area.
From October 1995 through December 1999. this 2.7km long
beltway has been
successfully carried out and completed by Samwhan.
The best feature of the Works is 1,873m long 4-lane Suri
tunnel consisting of 2
separate tunnels. |
|
|

|