Foundation
Improvement Project for Korean National Railroad
Jeolla Line Lot 8. Sin-ri ~ Suncheon Section |
|
|
Samwhan
carried out the rehabilitation works to improve existing
single track into a
new double track at Jeolla Line Railroad, Lot 8, linking
Sin-ri and Suncheon in Korea.
Its total length was 11.52km and it covered construction
of 24 bridges, 6 tunnels
and 2 stations.
Construction period : September 19, 1989 to august 19, 1999,
Construction cost : 41.6 Billion Korean won. |
|
|

|