project is aimed at a new settlement program for the 4
units of 250 MW Pumped
Storage Power Station, which is located at Yangyang-gun,
Gangwon-do Province , Korea.
Samwhan is carrying out civil works for the plant capable
of producing approximately
2,000 GWH per year. Project is expected to be completed
in 2006. |
| Main
Features of the project |
- Upper
Dam : Concrete Faced Rock Fill Dam (C. F. R. D)
Height = 72 m, Length = 435 m, Width
= 240 m, Volume = 1,265,000 §©, Pondage = 4,932,000 §©
- Lower Dam : Concrete Gravity Dam (C. G. D)
Height = 52 m, Length = 247 m, Width
= 52 m, Volume = 156,000 §©, Pondage = 9,222,000 §© -
Underground Power House ( Underground Cavern Type )
Height = 43.3 m, Length = 120 m,
Width = 20 m, Excavation Volume = 101,711§© -
Underground Transformer ( UnderGround Cavern Type )
Height = 33.9 m, Length = 119 m,
Width = 19 m, Excavation Volume = 55,731 §© -
Power Tunnel Vertical
Tunnel = 757 m, Horizontal Tunnel = 1,361 m (Total = 2,118
m), Steel Penstock Tunnel =
430 m, Access Tunnel = 1,914 m, Cable Tunnel = 1,835 m,
Tailrace Tunnel = 3,063 m, Work
Adit Tunnel = 4,583 m, Total length of Tunnels : 15.2 §°
- Approach Road = 4,802 m -
Management building and other incidental facilities
- Mechanical & Electrical Works
Pump-Turbine : 265 §Ò x 4 sets, Generator
Motor : 4 sets, Speed Governor : 4 sets, Pressure
Oil Supply System : 4 sets & etc. |
| |
 |
|
| |
|
 |
|