Yangyang Pumped Storage Hydropower Plant
Underground power House
This project is aimed at a new settlement program for the 4 units of 250 MW Pumped
Storage Power Station, which is located at Yangyang-gun, Gangwon-do Province , Korea.
Samwhan is carrying out civil works for the plant capable of producing approximately
2,000 GWH per year. Project is expected to be completed in 2006.
Main Features of the project
- Upper Dam : Concrete Faced Rock Fill Dam (C. F. R. D)
    Height = 72 m, Length = 435 m, Width = 240 m, Volume = 1,265,000 §©, Pondage = 4,932,000 §©
- Lower Dam : Concrete Gravity Dam (C. G. D)
    Height = 52 m, Length = 247 m, Width = 52 m, Volume = 156,000 §©, Pondage = 9,222,000 §©
- Underground Power House ( Underground Cavern Type )
    Height = 43.3 m, Length = 120 m, Width = 20 m, Excavation Volume = 101,711§©
- Underground Transformer ( UnderGround Cavern Type )
    Height = 33.9 m, Length = 119 m, Width = 19 m, Excavation Volume = 55,731 §©
- Power Tunnel
    Vertical Tunnel = 757 m, Horizontal Tunnel = 1,361 m (Total = 2,118 m),
    Steel Penstock Tunnel = 430 m, Access Tunnel = 1,914 m, Cable Tunnel = 1,835 m,
    Tailrace Tunnel = 3,063 m, Work Adit Tunnel = 4,583 m, Total length of Tunnels : 15.2 §°
- Approach Road = 4,802 m
- Management building and other incidental facilities
- Mechanical & Electrical Works
    Pump-Turbine : 265 §Ò x 4 sets, Generator Motor : 4 sets, Speed Governor : 4 sets,
    Pressure Oil Supply System : 4 sets & etc.
 
   
Upper Dam
Lower Dam