| Length
and diameter of the pipe line : 42.815 §° x 26 inch steel
pipe.
Construction of Natural Fas Supply Management Office,
Governor Station and Cut off
facilities are included in the project.
Construction period : January 1994 to September 1996.
In addition, Samwhan completed main gas pipeline project
in Gyeonggi ~ Incheon region on December 31, 1995.
Work comprised of 66.9 §° (D=26~30 inches) pipeline and
6 buildings of Governer Station.
Samwhan also completed on March 31, 1995, Gyeongsang region
Oil Pipe Line
Project with the length of 78.9 §° (D=2 inches) and 11
numbers of valve boxes.
|