| Name
of Project
(Location) |
Owner/Clint |
Period of
Work |
Scope Work |
Military Compound Facilities
Construction Project
(Seongnam-si, Korea) |
ROK Army |
Dec. 16, 02
Dec. 15, 03 |
Earthwork : 307,087§³,
Piping Work : 2,629m
Pavement : 392§³, Pond :1ea,
Sprinkler Plumbing : 9,239m,
Water Supply Line : 489m
Turfing : 50,667§³, Landscaping
Work i.e. tree planing, etc. |
National Highway No. 14
Gochang~Jangseong Section, Lot 3
(Jeonbuk, Korea) |
Korea Highway
Corp. |
40 Months
after Dec. 02 |
L=5.82§°, B=23.4m(4 lanes),
Cutting : 1,958§©,
Embankment : 2,888§©,
Pipe Culvert : 1,063m(52 places),
Box Culvert : 726m(15 places),
Small Bridge : 2ea with 160m,
Large Bridge : 10ea with 3,047m,
Tunnel : 859m(2 lanes),
Ascon Pavement : 538a,
Concrete Pavement : 57,819§©,
2 Toll Gates and 1 Office Bldg. |
National Highway No. 14
Gochang~Jangseong Section, Lot 1
(Jeonbuk, Korea) |
Korea Highway
Corp. |
40 Months
after Dec. 02 |
L=6.8§°, B=23.4m(4 lanes),
Cutting : 665,000§©,
Embankment : 1,389,000§©,
Pipe Culvert : 962m(38 places),
Box Culvert : 1,003m(23 places),
Small Bridge : 5ea with 187m,
Large Bridge : 5ea with 1,641m,
Tunnel : 624m(2 lanes),
Ascon Pavement : 449a,
Concrete Pavement : 50,830§©,
1 Toll Gates. |
Korean National Railroad,
Jungangseon Line Double
Tracking Between Deokso
and Wonju, Lot 7
(Gyeonggi-do, Korea) |
Korea National
Railroad |
60 Months
afer Dec. 02 |
Length : 8.53km
Cutting : 754,000§©,
Embankment : 501,000§©
6 Bridge(L=1,392m),
2 Tunnels(L=5,260m),
2 Stations and 1 Interchange. |
154kv Transmission Line
between Deoggye and Jeongok
(Gyeonggi-do, Korea) |
Korea Electric
Power Corp. |
570 days
after Dec. 02 |
Length : 2 C - 29.5km
Support Structure : 93 units of
Rectangular Steel Tower for
2 Circuits
Electric Cable : ACSR 410§± x2 B |
Highway Construction between
Muan and Gwangu, Lot 3
(Jeonnam, Korea) |
Korea Highway
Corp. |
50 months
after Dec. 02 |
Cutting : 805,485§©,
Embankment : 1,312,506§©
Drain pipe 45 units 1,202m,
Culvert 18 units 827m
Large Bridge 3 units 735m,
Small Bridge 7 units 353m
5 Tunnels 1,840m, 1 Toll gate
Asphalt concrete pavement 658a,
Cement concrete Pavement 44,540§© |
Gil-dong Drainage System
Construction Project
(Seoul, Korea) |
Office of Water-
works, Seoul
Metrorolition
Government |
Dec. 12, 02
Jun. 11, 03 |
Draining Capacity : 60,000§©
Pipeline : L=4km(¥Õ=1,350~1,650§®)
1 Drainage Control Station &
1 Testing Station, Machinery
Installation and other Incidental
Works, etc. |
National Highway Expansion
and Pavement Project between
Hakgok and Gosan
(Gangwon-do, Korea) |
Hwengseong
Contry Office |
Feb. 18, 02
Dec. 17, 03 |
Cuttiing : 58,161§©,
Compacted Fill : 89,971§©
Emnankment : 23,448§©,
V-type Side Ditch : 15ea, L=1,944m
Side Drainge : 24ea, L=344m
L-type Retaining Wall : 2ea, L=362m
Rockslide Retaining Wall : 1ea, 16m |
Telecommunication Cable
Installation between
Hoenggye and Jumunjin
(Gangwon-do, Korea) |
Korea Highway
Corp. |
Sep. 26, 01
Nov. 24, 01 |
Installation of 76.5km Optical Fiber
Cable and 44.6km Screen Cable |
Daegu Subway Line No. 2
Construction Project
(Bongsan Crossway)
(Daegu, Korea) |
Subway
Construction
Hqs,. Daegu
Metropolitan
City |
Oct. 05, 00
Oct. 04, 03 |
L=610m,Ventilator : 30.2m |
|